Services

Project Management, Supervision & Monitoring

Client:

M/s. Barhel Cement Company Ltd. Hodan, Mogadishu, Somalia

Project:

Mogadishu Cement Terminal

Project Cost:

Project Year:

5.0 Million USD

2023 (In Hand)

Scope of Work:

Pre-Project Study & Project Monitoring

Client:

M/s. ANJUMAN KHUDDAM-UL-QURAN SINDH, KARACHI

Project:

Jamia ul Quran Masjid – Gulshan-e-Maymar

Project Year:

2023 (In Hand)

Scope of Work:

Pre-Project Study & Project Monitoring

Client:

M/s. Faysal Bank Ltd.

Project:

Setting up of 5,000 M. Tons Ethanol Storage & Filling along with ISO Tanks Cleaning, Repair & Maintenance Facility by Marine International Liquid Terminal (MILT by PMS – Marine Group)

Project Cost:

Project Year:

PKR 2.030 Billion 

2020 – 2023 (Completed)

Scope of Work:

Pre-Project Study & Project Monitoring

Client:

M/s. Habib Bank LTD.

Project:

Installation of 300,000 MTA CRC Manufacturing Plant of Ittehad Steel at Faisalabad.

Project Cost:

Project Year:

PKR 13.684 Billion  

2023 (Hold due to Current Situation in Pakistan)

Scope of Work:

Pre-Project Study & Project Monitoring

Client:

M/s. National Bank of Pakistan

Project:

Installation of 202,684 Bags per Annum Spinning Plant of M/s. Sadaqat Limited.

Project Cost:

Project Year:

PKR 3.129 Billion

2021

Scope of Work:

Pre-Project Study & Project Monitoring

Client:

M/s. National Bank of Pakistan

Project:

Setting up of 40-MW Biomass Power Plant at M/s. Flying Cement Company Ltd. Khushab comprising of Steam Turbine, Turbo Generator, Boiler, Water
Treatment Plant & Storages, Effluent/Sewage Treatment plant, Biomass
Storages & Conveying System and Allied facilities including Piping / Pump
satiations etc.

Project Cost:

Project Year:

PKR 8.50 Billion 

2020 (Hold due to Current Situation in Pakistan)

Scope of Work:

Pre-Project Study & Project Monitoring

Client:

M/s. Shaheen Air International

Project:

Design & Construction of Simulator Building at Jinnah International Airport including Civil, Mechanical & Electrical/Instrumentation Work

Project Cost:

Project Year:

PKR 40 Million

2020 in hand

Scope of Work:

Preparation of conceptual design, Detailed Civil Work Design & drawings, Electrical & instrumentation drawings, project monitoring & management, Assistance in installation & commissioning

Client:

M/s. Power Cement Ltd.

Project:

7,700 TPD Clinker Production line-III Project

Project Cost:

Project Year:

PKR 31.50 Billion Civil Works cost      PKR 4.25 Billion

2017 – 2019

Scope of Work:

Supervision & Monitoring of Civil Works comprising of more than 100,000 Cu. M of RCC works including preparation of BOQ, Review of construction Method Statement, QA/QC of work as per Project Main Consultant guidelines, Stage Inspection, Coordination of Civil Works with Mechanical 7 Electrical Installations, Review of Progress of the work and inform client about delays and remedial actions, Preparation of Weekly/monthly progress reports, Verification of contractors Invoices/Bills, etc.

Client:

M/s. Power Cement Ltd.

Project:

7,700 TPD Clinker Production line-III Project

Project Cost:

Project Year:

PKR 31.50 Billion Civil Works cost      PKR 4.25 Billion

2017 – 2019

Scope of Work:

Supervision & Monitoring of Civil Works comprising of more than 100,000 Cu. M of RCC works including preparation of BOQ, Review of construction Method Statement, QA/QC of work as per Project Main Consultant guidelines, Stage Inspection, Coordination of Civil Works with Mechanical 7 Electrical Installations, Review of Progress of the work and inform client about delays and remedial actions, Preparation of Weekly/monthly progress reports, Verification of contractors Invoices/Bills, etc.

Client:

M/s. Thatta Cement Company Ltd.

Project:

Balancing Modernization & Rehabilitation (BMR) Project at M/s. TCCL through installation of In-Line Pre-calciner & Modification in Pre-heater Cyclones, Kiln Clinker Cooler etc.

Project Cost:

Project Year:

PKR 1.350 Billion

2017 – 2019

Scope of Work:

Review and comments on conceptual design, integrity of new and existing plant,
equipment and machinery, reliability, consistent performance to achieve the guaranteed
operating parameters including Project Management, Monitoring, Vetting of Design of
Civil Foundations and Pre Calcinier Steel Structure Building. Review of Construction
Contracts, Review of Project Master & Detailed Schedule, Stage Inspection, Verification
of Invoices/ Bills etc.

Client:

M/s. Granite & Marble Resources

Project:

Erection /Installation of granite & Marble Factory at Marble City Karachi

Project Cost:

Project Year:

PKR 150 Million

2012

Scope of Work:

Co-ordination b/w/ Client & Contractor, Assistance in Selection of Local equipment
manufacturers and contractor for manufacturing & installation work, preparation of
detailed drawings & BOQ, project management, monitoring, supervision during
installation, testing & commissioning of facility etc.

Client:

M/s. BOC Pakistan (Linde Group)

Project:

Installation of CO2 manufacturing Plant at Port Qasim including Civil Works, Installation of Pre-fabricated buildings & structures, CO2 Generation & processing Plant, storage tanks etc.

Project Year:

2008 -2009

Scope of Work:

Preparation of tender documents, preparation of comparative statements, Selection of Local contractor for installation work, supervision during installation, testing & commissioning of plant, preparation of steel structure drawings & BOQ, etc.

Client:

M/s. Magna Steel Pvt. Ltd.

Project:

Installation of 1.0 MTPA Steel Melting & Re-rolling Plant at Nooriabad including Civil
Works, Installation of Pre-fabricated buildings & structures, Furnaces, OH Cranes,
Other Processing Plant, Equipment & Machinery etc.

Project Year:

2008 -2009

Scope of Work:

Co-ordination b/w/ Client & OEM, Preparation of tender documents, preparation of
comparative statements, Selection of Local equipment manufacturers and contractor for
installation work, Award of Work, , preparation of drawings & BOQ, project management,
monitoring, supervision during installation, testing & commissioning of plant, etc.

Client:

M/s. Shaheen Air International

Project:

Design & Construction of Aircraft Maintenance Hangar at Jinnah International Airport including local Civil, Mechanical & Electrical/Instrumentation Work

Project Cost:

Project Year:

PKR 250 Million

2007 – 2009

Scope of Work:

Preparation of conceptual design, Design of Civil Foundation & Structures, Preparation
of Bill of Quantities, Supervision for Construction & Installation of Civil and Steel
Structures, Designing of Electrical, Instrumentation and Fire Fighting System, Stage
Inspections, Project Monitoring, Coordination b/w client & Contractors etc.

Client:

M/s. Al-Abbas Cement Industries Ltd.

Project:

Up-gradation Project from 1,500 TPD to 3,000 TPD Clinker at Line-I & II at M/s. AACIL through installation of In-Line Pre-calciner, Modification in Pre-heater Cyclones, Kiln & Clinker Cooler, Vertical Raw & Cement Mills, Packing plant etc.

Project Cost:

Project Year:

PKR 2.00 Billion

2005 – 2007

Scope of Work:

Review and comments on conceptual design, integrity of new and existing plant, equipment and machinery, reliability, Review of Project Master & Detailed Schedule, Stage Inspection, Verification of Invoices/ Bills etc. Co-ordination b/w Client and Main Equipment Supplier, preparation of Tender Enquiries, Technical & Financial Evaluations, Selection of Local Equipment Manufacture, Award of Work, Design/drawings of Civil Foundations and Structures, Preparation of Consolidated Bill of Materials on SQL Server based software, Project Management, Project Monitoring, Assistance in Commissioning and Trail run etc.

Client:

M/s. Thatta Cement Company Ltd.

Project:

Up-gradation of Plant from 1,000 to 1,500 TPD Clinker through modification in Pre-
heater Cyclones, Kiln & Clinker Cooler, clinker Transport system, Raw Mill & Cement Mill Area, etc.

Project Cost:

Project Year:

PKR 600 Million

2005 – 2006

Scope of Work:

Preparation of Tender Enquiries, Technical & Financial Evaluations, Selection of Local
Equipment Manufacture, Award of Work, Preparation of Consolidated Bill of Materials,
Project Management, Project Monitoring, verification of Invoices/Bills, Assistance in
Commissioning and Trail run etc.

Client:

M/s. Pakistan Petroleum Ltd.

Project:

Manufacturing of Porta Cabins for RIG IDECO H-725 for Kandhkot Site including
supervision of Civil Works, Installation of Porta Cabins, Hook Up and ancillary facilities.

Project Year:

2001 -2002

Scope of Work:

Co-ordination b/w/ Client & Contractor, Assistance in Selection of Local equipment
manufacturers and contractor for manufacturing & installation work, preparation of
detailed drawings & BOQ, project management, monitoring, supervision during
installation, testing & commissioning of facility etc.

Client:

M/s. Zia-ul-Haq & Sons

Project:

Technical Security System & Renovation of American Consulate Peshawar & Quetta

Project Cost:

Project Year:

PKR 30.0 Million

2001 -2002

Scope of Work:

Design, Preparation of drawings and Bill of Quantities for Mechanical Security System, HVAC, Electrical & Instrumentation and Fire Fighting Systems etc.

Client:

M/s. Quran Academy Karachi

Project:

Design & project Management of Expansion Project at Yaseenabad Markaz

Project Cost:

Project Year:

PKR 30.0 Million

2001 -2002

Scope of Work:

Design, preparation of drawings for RCC and Steel Structures, preparation of Bill of
Quantities, preparation of Electrical drawings, preparation of Fire Fighting drawings, Top
Supervision during construction etc.