Services

Design & Drawings for Civil, Structure, Mechanical & Electrical Works

Client:

M/s. Loya Associates

Project:

3,500 TPD Cement Plant of M/s. Lucky Al-Shumookh Samawa

Project Year:

Year: 2019 -2020

Scope of Work:

Preparation of drawings for Steel Structures for Raw Material Intake, Transport,
Blending Silo, Raw Mill, Clinker Cooler, Clinker Transport System, Clinker Storage Yard,
Cement Silo and Ancillary Structures in these Areas. Approximate weight of steel
structures is more than 2,000 M. Tons.

Client:

M/s. Pakistan Synthetic Ltd. Hub, Baluchistan.

Project:

Design & drawings for 08 Tons Double Girder OH Travelling Crane

Project Year:

Year: 2019

Scope of Work:

Design/ drawings of Main Girder, End carriages, platform including detailing and BOQ.

Client:

M/s. Flying Cement Company Ltd.

Project:

7,700 TPD Clinker production Line-II

Project Year:

Year: 2018 – in hand

Scope of Work:

Design & Preparation of drawings for Civil Structures & Foundations for Blending Silo,
Raw Mill, Kiln Piers, Clinker Cooler, Clinker Transport System, Clinker Storage Yard,
Cement Silo and KID Fan and Ancillary Foundations in these Areas.

Client:

M/s. Loya Associates

Project:

BRT Project at Peshawar

Project Year:

Year: 2018 -2019

Scope of Work:

Design & Preparation of drawings along with Consolidated Bill of Materials for BRT stations, Walkways, pedestrian bridges etc.

Client:

M/s. Thatta Cement Company Ltd.

Project:

Design & Construction of 6,000 M. Tons Storage CF Silo

Project Year:

Year: 2018

Scope of Work:

Design & Preparation of Civil & Mechanical works drawings along with Consolidated Bill of Materials

Client:

M/s. Loya Associates.

Project:

BRT Project at Peshawar

Project Year:

Year: 2018 -2019

Scope of Work:

Design & Preparation of drawings along with Consolidated Bill of Materials for BRT stations, Walkways, pedestrian bridges etc.

Client:

M/s. Thatta Cement Company Ltd.

Project:

Design & Construction of 6,000 M. Tons Storage CF Silo

Project Year:

Year: 2018

Scope of Work:

Design & Preparation of Civil & Mechanical works drawings along with Consolidated Bill of Materials

Client:

M/s. Loya Associates

Project:

Design & Drawings of Bahria Icon Steel Canopy

Project Year:

Year: 2017

Scope of Work:

Design & Preparation of drawings of Pre-fabricated steel canopy along with BOQ

Client:

M/s. Lucky Cement Ltd. Basra Cement Plant

Project:

Design & Drawings of Steel Structure for 3,000 TPD Cement Plant

Project Year:

Year: 2017

Scope of Work:

Design & Preparation of drawings of steel Structure for Belt conveyors, Air slides,
Bucket Elevator along with BOQ. Approx. weight was 6,00 M. tons. Job was done in
association with M/s. Loya Associates.

Client:

M/s. ZRK Group

Project:

Design of Depither System

Project Year:

Year: 2016 – 2018

Scope of Work:

Design & Preparation of drawings for silos, feeding belt conveyor, pin feeder, depither
structure, discharge system, screw conveyor, strainer, cyclone, ducting & bunker, along
with civil foundations, retaining walls &ramp etc.

Client:

M/s. Lucky Cement Ltd. Karachi Plant

Project:

Design & Drawings of Steel Structure for 4,000 TPD Clinker Line-H

Project Year:

Year: 2016

Scope of Work:

Design & Preparation of drawings of steel Structure for Belt conveyors, Air slides,
Misc. Equipment along with BOQ. Approx. weight was 1,000 M. tons. Job was done in
association with M/s. Loya Associates.

Client:

M/s. Lucky Cement Ltd. Nyumba Ya Akiba Cement Plant Congo

Project:

Design & Drawings of Steel Structure for 3,000 TPD Cement Plant

Project Year:

Year: 2016

Scope of Work:

Design & Preparation of drawings of steel Structure for Belt conveyors, Air slides,
Bucket Elevator, Raw Mill Building, Cement mill Building, Coal Mill Building, Crusher
building etc. along with BOQ. Approx. weight was 5,500 M. tons. Job was done in association with M/s. Loya Associates.

Client:

M/s. Thatta Cement Company Ltd.

Project:

Design & Drawings of Foundation & Steel Silo for Cement Storage

Project Year:

Year: 2016

Scope of Work:

Design & Preparation of drawings of RCC Foundation & Structure with 400 M. tons storage Steel Silo etc. along with BOQ.

Client:

M/s. Power Cement Ltd.

Project:

Design & Drawings of RCC Foundation for New Bag Filter

Project Year:

Year: 2016

Scope of Work:

Design & Preparation of drawings of RCC Foundation for New Bag Filter with BOQ and engineers estimate

Client:

M/s. PLINKE GmbH

Project:

Design & Drawings of Steel Structures for 06-Storey Nitric Acid plant at Wah

Project Year:

Year: 2016-2017

Scope of Work:

Design & Preparation of drawings of Steel Structures with detailed fabrication drawings,
with BOQ, including cladding, drainage, lightening arrestors etc. Total weigh of structure was 750 M. Tons

Client:

M/s. ZRK Group

Project:

Design & Drawings of RCC Foundations & Structure for Medium Density Fiber (MDF) Board plant at Mardan

Project Year:

Year: 2015

Scope of Work:

Design & Preparation of drawings of RCC Foundations, Sub & Super Structure
including Belt conveyor, Storage silos, plant Pre-fabricated steel building along with
BOQ.

Client:

M/s. ZRK Group

Project:

Design & Drawings of Steel Structure for Medium Density Fiber (MDF) Board plant at Mardan

Project Year:

Year: 2015

Scope of Work:

Design & Preparation of drawings of Steel Structure for Chipper & de-barker Line
including Belt conveyor, Storage silos, plant Pre-fabricated steel building along with
BOQ. Approx. weight of steel structure was 1,200 M. tons. Total Cost of Project was
PKR 7.0 Billion

Client:

M/s. Al-Huymin Cement Plant Kingdom of Saudi Arabia

Project:

Design & Drawings of RCC Foundations & Steel Structures for Cement plant

Project Year:

Year: 2014-2015

Scope of Work:

Design & Preparation of drawings of RCC Foundations and Steel Structures with
detailed fabrication drawings, with BOQ for Raw Miil, Cement Mill, Belt Conveyors, Air
Slides, Bucket Elevator etc. Total weigh of structure was 2,500 M. Tons

Client:

M/s. Al-Bijjar Trading FZC Dubai.

Project:

3,500 TPD Clinker Production Plant of M/s. Falcon Cement Bahrain

Project Year:

Year: 2014 -2015

Scope of Work:

Design/ drawings of Civil Foundations/ Structures and Design/ Drawings for Mechanical
Structures. Scope of work included designing of structures on Staad Pro & ETABS
software, preparation of drawings, detailing and Bill of Quantities. The total tonnage
design is 800 ton.

Client:

M/s. Dewan Cement Ltd.

Project:

Design & Drawings of Foundation & Steel Silo for Slag Storage Silo

Project Year:

Year: 2013

Scope of Work:

Design & Preparation of drawings of RCC Foundation & Structure with 350 M. tons storage Steel Silo etc. along with BOQ and engineers estimate.

Client:

M/s. Dadu Sugar Mills Ltd.

Project:

Design & Drawings of RCC Foundations & Structures for New 34 TPH Boiler along with Allied Equipment for 4,000 TCD

Project Year:

Year: 2012

Scope of Work:

Design & Preparation of drawings of RCC Foundations, Sub & Super Structures for
New 34 TPH Boiler # 04 and its Allied Equipment with BOQ, Engineer’s Estimate and
preparation of Tender Documents

Client:

M/s. Khairpur Sugar Mills Ltd.

Project:

Design & Drawings of RCC Foundations & Structures for Expansion Project

Project Cost:

Project Year:

PKR 250 Million

Year: 2012

Scope of Work:

Design & Preparation of drawings of RCC Foundations, Sub & Super Structures, steel
Structures for Boiler, Clarifier, Continuous & batching type Vacuum Pans and Allied
Equipment with BOQ/BOM, Engineer’s Estimate and Site Supervision during
construction

Client:

M/s. ACL Wah Cement Company Ltd.

Project:

3,000 TPD Clinker Production Line-I

Project Year:

Year: 2011 -2012

Scope of Work:

Design & Preparation of drawings for Civil Structures & Foundations for Bucket
Elevator, feeding & discharge Air Slide, Review of foundation design of Blending Silo.

Client:

M/s. Mustehkum Cement Ltd.

Project:

Design & Drawings of Steel Structure for Up-gradation project

Project Cost:

Project Year:

PKR 225 Million

Year: 2011

Scope of Work:

Design & Preparation of drawings of Steel Structure for Belt conveyors, Air Slides, Bucket Elevator etc. along with BOQ and engineers estimate. Approx. wt. 1,500 M. Tons

Client:

M/s. Engro Polymer & Chemicals Ltd. port Qasim Karachi

Project:

Design & Drawings of Steel Structure for Up-gradation project

Project Year:

Year: 2010

Scope of Work:

Physical inspection & measurement of site, Design & Preparation of drawings of Steel Structure along with BOQ, QA/QC documents and other protocols

Client:

M/s. Pakistan Telecommunication Employees Tower, Islamabad

Project:

Design & Drawings of Steel Structure for BMU at PTET Building

Project Year:

Year: 2010

Scope of Work:

Physical inspection & measurement of existing RCC structure at site, Design &
Preparation of drawings of Steel Supports for Building Maintenance Unit guide track
along with BOQ, QA/QC documents, installation methodology and supervision during
manufacturing & installation on behalf of M/s. Welders International

Client:

M/s. Tele House Tower, Islamabad

Project:

Design & Drawings of Steel Structure for BMU at Tele House Building

Project Cost:

Year: 2010

Scope of Work:

Physical inspection & measurement of existing RCC structure at site, Design &
Preparation of drawings of Steel Supports for Building Maintenance Unit guide track
along with BOQ, QA/QC documents, installation methodology and supervision during
manufacturing & installation on behalf of M/s. Welders International

Client:

M/s. Islamabad Stock Exchange Builidng, Islamabad

Project:

Design & Drawings of Steel Structure for LED Screen at ISE Building

Project Cost:

Project Year:

PKR 20.0 Million

Year: 2008

Scope of Work:

Physical inspection & measurement of existing RCC structure at site, Design & Preparation of drawings of Steel Supports for LED support frame along with BOQ, QA/QC documents, installation methodology and supervision during manufacturing & installation on behalf of M/s. Wavetech

Client:

M/s. Islamabad Stock Exchange Builidng, Islamabad

Project:

Design & Drawings of RCC Foundations & Steel Structure for Heavy Machinery

Maintenance shed at Golden Palm Gwadar

Project Year:

Year: 2004-2005

Scope of Work:

Design & Preparation of drawings of RCC Foundations & Steel Structure for storage
shed along with BOQ, QA/QC documents, installation methodology and supervision
during manufacturing & installation

Client:

M/s. Pakland Cement Ltd. Karachi

Project:

Consolidated Bill of Materials for Locally manufactured Plant, Equipment & Machinery at 1,550 TPD Clinker Line-II

Project Year:

Year: 1999- 2000

Scope of Work:

Preparation of BOQ through computer software

Client:

M/s. Saadi Cement Ltd. Hattar Haripur

Project:

Consolidated Bill of Materials for Locally manufactured Plant, Equipment &

Machinery at 1,500 TPD Clinker Line-II & I

Project Year:

Year: 1999- 2000

Scope of Work:

Preparation of BOQ through computer software