The House of Professional Engineers, incorporated in 1994, is an Engineering Consultancy Firm registered with Pakistan Engineering Council. ISOTEC has been providing services to Cement, Sugar, Power, Chemical, Metal Engineering and Gas Processing Plants.
M/s. EFU Insurance
Al-Rahim Oil Tank Terminal Kemari
PKR Billion
Overall inspection of terminal as per API & NFPA standard for plant, equipment and machinery in terms of risks associated with it and analysis of results to categorize the
plant
M/s. EFU Insurance
26.35 MW Biomass Fired Power Plant at M/s. JDW Sugar Mills Unit-III Ghotki.
PKR Billion
Overall inspection of plant, equipment and machinery e.g. Medium Pressure Boiler,
Steam Turbine, Bagasse Conveying system, Turbo Generator, Water Treatment Plant,
Steam & Water Piping, Transformer, Grid Station, Control Systems, Fire Fighting
Systems, Fuel Storages etc. in terms of risks associated with it and analysis of results to
categorize the Risk factor of the plant.
M/s. EFU Insurance
13.2-MW Gas Fired GE Jenbacher Power Plant at M/s. Omni Group Matli
PKR Billion
Overall inspection of facility as per API & NFPA standard for plant, equipment and
machinery in terms of risks associated with it and analysis of results to categorize the
plant
M/s. EFU Insurance
23.5-MW Gas Fired GE Jenbacher Power Plant at M/s. Thatta power Plant Ltd.
PKR Billion
Overall inspection of facility as per API & NFPA standard for plant, equipment and
machinery in terms of risks associated with it and analysis of results to categorize the plant
M/s. EFU Insurance
Engro Food Chain Supply Mureedke Punjab
PKR Billion
Survey of plant, review of process, equipment specifications, Standard operating procedures etc. Overall inspection of terminal as per NFPA standard for plant, equipment and machinery in terms of risks associated with it and analysis of results to categorize the plant
M/s. EFU Insurance
M/s. Pioneer Cement Ltd. Line-I & II (2,200 TPD & 4,000 TPD) Khushab .
PKR Billion
Overall inspection of plant as per NFPA standard for plant, equipment and machinery in terms of risks associated with it and analysis of results to categorize the plant
M/s. EFU Insurance
M/s. Cherat Cement Ltd. Line-I & II (2,500 TPD & 3,200 TPD).
PKR Billion
Overall inspection of plant as per NFPA standard for plant, equipment and machinery in terms of risks associated with it and analysis of results to categorize the plant
M/s. EFU Insurance
M/s. Maple Leaf Cement Ltd. Line-I , II & III (1,000 TPD, 4,000 TPD & 6,000 TPD).
PKR Billion
Overall inspection of facility as per NFPA standard for plant, equipment and
machinery in terms of risks associated with it and analysis of results to categorize the
plant
M/s. EFU Insurance
M/s. Thatta Cement Company Ltd. Line-I (1,750 TPD).
PKR Billion
Overall inspection of facility as per NFPA standard for plant, equipment and
machinery in terms of risks associated with it and analysis of results to categorize the
plant
M/s. EFU Insurance
M/s. Attock Cement Ltd. Line-I & II (2,000 TPD & 3,300 TPD).
PKR Billion
Overall inspection of facility as per NFPA standard for plant, equipment and
machinery in terms of risks associated with it and analysis of results to categorize the
plant
M/s. EFU Insurance
M/s. Lucky Cement Ltd. Line-I-IV (2 x 2,200 TPD & 2 x 3,200 TPD) Pezu.
PKR Billion
Overall inspection of facility as per NFPA standard for plant, equipment and
machinery in terms of risks associated with it and analysis of results to categorize the
plant
M/s. EFU Insurance
M/s. Cherat Packaging Ltd. capacity 265 MTPA paper Bags & 145 MPTA PP Bags
PKR Billion
Overall inspection of facility as per NFPA standard for plant, equipment and
machinery in terms of risks associated with it and analysis of results to categorize the
plant